-
Rapid design-build can provide
parts
in 2 weeks.
-
Aluminum or tool steel (P-20).
-
Hand Lay-ins.
-
Insert Molds.
-
Rapid process yields production quality part...this allows:
- Shrinkage affirmation.
- Stack up of tolerance assessment.
- Life cycle testing.
- Mold changes quickly and CHEAPLY.
|
-
MUD.
-
Single to multi-cavity.
-
Simple to complex.
-
1 part to ?
-
Aluminum or tool steel.
-
Fast and Accurate.
-
Hand Lay-ins, Insert Molds, Overmolding.
-
Most commodity and engineered thermoplastic resins.
|